Mosley St | Motel System Upgrades
Wasaga Beach

Property Type: Existing 1-Storey, 9-Unit Motel
Scope of Work: Interior Alterations for HVAC, Insulation, and Plumbing System Upgrades
Project Overview:
Located in the heart of Wasaga Beach, this 9-unit single-storey motel underwent critical interior upgrades to improve energy efficiency, mechanical reliability, and overall guest comfort. While the structure remained unchanged, our team was brought on to prepare the full set of existing building plans and coordinate with engineering for the design of all mechanical upgrades.
Scope & Strategy:
Prepared full existing building documentation to support permit application
Detailed insulation upgrade specs to align with current energy efficiency standards
Coordinated new HVAC layout and equipment sizing with engineering team
Developed new plumbing plans to replace aging systems while minimizing interior disruption
Ensured code compliance without triggering change-of-use or addition-based requirements
Challenges Solved:
Documented complex existing conditions in an older structure with limited records
Integrated new systems into the building without extensive demolition or downtime
Streamlined approvals by clearly distinguishing between upgrades vs. major alterations
Achieved improved comfort and mechanical reliability without triggering zoning or use-related delays
Investor Benefits:
Increased energy efficiency and reduced operational costs
Extended the building’s service life through upgraded HVAC and plumbing infrastructure
Avoided drawn-out approvals by keeping scope focused on interior system improvements
Allowed owners to continue generating revenue during phased construction
Current Status:
Permit approved. Construction completed.